ASGCO BC-2 Instruções de instalação, operação e manutenção - Página 5
Procurar online ou descarregar pdf Instruções de instalação, operação e manutenção para Equipamento industrial ASGCO BC-2. ASGCO BC-2 9 páginas. With bolt-up tensioner system
3. MOUNTING BRACKETS
Insert the tube with attached blades through the chute cut outs. Determine the desired position of the
mounting brackets. Attach the mounting brackets to the chute wall by welding or bolting through the
mounting holes along the mounting brackets' length, or to the conveyor frame using the two holes on
top of each mounting bracket.
4. MOUNTING TUBE
A - Dimension will always be to the left hand side of the conveyor when looking at the tail from the
head pulley and B - Dimension will always be on the right.
Optional
Mounting
Orientation
It is important to note, if using optional mounting positions over recommended
mounting positions, rotate tube along the tube axis, not end over end. This will
ensure the A and B sides of the tube remain in the correct orientation.
Recommended
Mounting
Orientation
BC-2™ INSTALLATION
BC-2
w/Bolt-Up
Tensioner
™
™
3