ASGCO U-Scrape Instruções de instalação, operação e manutenção - Página 5

Procurar online ou descarregar pdf Instruções de instalação, operação e manutenção para Equipamento industrial ASGCO U-Scrape. ASGCO U-Scrape 7 páginas. With bolt-up tensioner system

PROCEDURE
Mount the bolt-up brackets first. The mounting holes need to accept 1/2" bolts. You can install the bolt-
ups with the supplied hardware and leave the brackets hanging down just enough to install the spring
plates. Then tighten the bolt-ups down.
Step 1
Pre-assemble the spring hanger extension
brackets to the spring plates, and the bushing
adjusting brackets with supplied hardware
before hanging the bolt-up brkts.
Step 2
Hang the U-Scrape with its tube on the bush-
ing adj. angles, and slide on the 2 each tube
bushings.
Step 3
Next bolt into place the tube bushings using
the supplied hardware.
Spring Hanger
Extension
Bracket
Bolt-Up Bracket
U-Scrape with Tube
Tube Bushing
Bushing Adj. Angle
U-SCRAPE™ INSTALLATION
Spring Plates
Bolt-Up Bracket
Bushing Adj. Angle
Spring Plates
Bushing Adj. Angle
Tube Bushing
Bushing Adj. Angle
U-Scrape™
3