Empire VFD42FB2MF-6 Инструкции по установке и руководство пользователя - Страница 11

Просмотреть онлайн или скачать pdf Инструкции по установке и руководство пользователя для Крытый камин Empire VFD42FB2MF-6. Empire VFD42FB2MF-6 20 страниц. Deluxe universal firebox for all vent-free log sets models

OPTIONAL FBB5 SINGLE SPEED BLOWER INSTALLATION INSTRUCTIONS
4. Remove air deflector by removing the four screws securing it
to the blower assembly.
REMOVE AIR
DEFLECTOR
5. Insert blower assembly into interior, bottom of firebox. Posi-
tion blower assembly so that you align the notch on back of
blower assembly with the center screw on firebox back, then
push the blower assembly against firebox back. The blower
wheel must be centered with the back wall of the firebox. The
magnets on the back and bottom of blower assembly will suf-
ficiently hold blower assembly in place.
6. Push tab away with standard screwdriver on upper right fire-
box .
7. Next, find the fan control switch and wire assembly. Feed the
wires through the hole at the top of the firebox, and secure the
fan control switch with two #6 screws provided. See Figure 17.
FAN CONTROL
SWITCH LOCATION
FAN CONTROL WIRES
39000-2-0820
Figure 16
Figure 17
8. The fan control wires will slide down between the firebox and
outer wrap near the blower assembly. See Figure 17.
9.
One fan control wire will have a 1/4 inch female terminal that
must be attached to the open terminal on the blower motor.
See Figure 20, Connection A.
10. The other fan control wire has a 1/4 inch male terminal. Attach
this terminal to the open terminal on the blower power cord.
See Figure 20, Connection B.
11. Route the wires away from moving parts of the blower assem-
bly and retain wires together near the blower motor using the
plastic purse clip provided.
12. To complete the installation, plug the power cord into the junc-
tion box receptacle at the right rear corner of the firebox outer
wrap. See Figure 19.
13. If room permits, the power cord can be located from the out-
side of the unit looking through the junction box access hole
(with the junction box removed), then plug up the power cord
before reinstalling the pre-wired junction box.
14. Once all connections are made electrically, it is recommended
that you test the blower fan control operation by turning on
power to the blower (CAUTION: 110 Volt). Then apply heat to
the fan control switch inside the firebox with a lighter or match
until blower is activated. Once blower is activated, check for
proper operation. Do not place hands near blower assembly
or other wiring while power is on.
15. Replace blower access plate and/or reinstall the brick liner
panels if provided.
16. This completes the installation of the optional FBB5 Blower kit
accessory.
NOTE: This blower is equipped with a heat activated fan control
switch. Blower will operate when the firebox warms up, and will
turn off automatically when the firebox cools down.
BLOWER POWER CORD
Figure 18
Page 11