Dell PowerEdge 6800 Руководство по устранению неполадок - Страница 8
Просмотреть онлайн или скачать pdf Руководство по устранению неполадок для Сервер Dell PowerEdge 6800. Dell PowerEdge 6800 16 страниц. Installation and troubleshooting guide (.htm)
Tower-to-Rack Kit Contents
The tower-to-rack kit includes the following items (see Figure 1-1):
•
One rack front panel with rack handles and thumbscrews
•
Twenty-one 6-32 x 0.312-inch black pan-head Torx screws
•
Four 6-32 x 0.312-inch black flat-head Phillips screws
•
Six shoulder mounting screws
•
Replacement rack control-panel bracket
An optional rack bezel, complete with keylock and keys, is available separately.
Figure 1-1. Tower-To-Rack Kit Contents
rack front panel
Recommended Tools and Supplies
•
#2 Phillips screwdriver
•
1/4-inch nut driver
•
T-10 Torx driver (for removing and installing the front panels)
•
T-15 Torx driver (for removing and installing the front panels)
Conversion Tasks
Installing a rack kit involves performing the following tasks:
•
Removing the optional tower bezel, feet, and cover
•
Removing the control panel assembly and tower front panel
•
Installing the rack front panel and control panel assembly
•
Removing the trim panel
•
Installing the system in the rack
•
Installing the optional rack bezel
8
Tower-to-Rack Conversion Guide
rack control panel bracket
shoulder mounting
screws (6)
6-32 x 0.312
Torx screws (4)
6-32 x 0.312 Torx
screws (21)