Dell PowerEdge 6800 Manuale di risoluzione dei problemi - Pagina 8

Sfoglia online o scarica il pdf Manuale di risoluzione dei problemi per Server Dell PowerEdge 6800. Dell PowerEdge 6800 16. Installation and troubleshooting guide (.htm)

Tower-to-Rack Kit Contents

The tower-to-rack kit includes the following items (see Figure 1-1):
One rack front panel with rack handles and thumbscrews
Twenty-one 6-32 x 0.312-inch black pan-head Torx screws
Four 6-32 x 0.312-inch black flat-head Phillips screws
Six shoulder mounting screws
Replacement rack control-panel bracket
An optional rack bezel, complete with keylock and keys, is available separately.
Figure 1-1. Tower-To-Rack Kit Contents
rack front panel

Recommended Tools and Supplies

#2 Phillips screwdriver
1/4-inch nut driver
T-10 Torx driver (for removing and installing the front panels)
T-15 Torx driver (for removing and installing the front panels)

Conversion Tasks

Installing a rack kit involves performing the following tasks:
Removing the optional tower bezel, feet, and cover

Removing the control panel assembly and tower front panel

Installing the rack front panel and control panel assembly

Removing the trim panel

Installing the system in the rack

Installing the optional rack bezel

8
Tower-to-Rack Conversion Guide
rack control panel bracket
shoulder mounting
screws (6)
6-32 x 0.312
Torx screws (4)
6-32 x 0.312 Torx
screws (21)