Cisco ONS 15454 Установите
Просмотреть онлайн или скачать pdf Установите для Сервер Cisco ONS 15454. Cisco ONS 15454 32 страницы. Four-shelf and zero-shelf bay assembly
Также для Cisco ONS 15454: Руководство по установке (22 страниц), Установите (32 страниц), Распаковка и установка (42 страниц), Распаковка и установка (40 страниц)
Install the Shelf and Backplane Cable
This chapter provides procedures for installing the Cisco ONS 15454. For a summary of the tools and
equipment required for installation, see the
Before You Begin
This section lists the chapter procedures (NTPs). Turn to a procedure for applicable tasks (DLPs).
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
March 2005
NTP-A1 Unpack and Inspect the ONS 15454 Shelf Assembly, page
before continuing with the
NTP-A2 Install the Shelf Assembly, page
assembly in a rack.
NTP-A3 Open and Remove the Front Door, page
equipment before continuing with other procedures.
NTP-A4 Remove the Backplane Covers, page
backplane before continuing with other procedures.
NTP-A5 Install the EIAs, page
This procedure is a prerequisite to the
procedure on page
1-22.
NTP-A6 Install the Power and Ground, page
the
"NTP-A7 Install the Fan-Tray Assembly" procedure on page
NTP-A7 Install the Fan-Tray Assembly, page
assembly in the shelf.
NTP-A119 Install the Alarm Expansion Panel, page
planning to install the Alarm Interface Controller–International (AIC-I) card and want to increase
the number of alarm contacts provided by the AIC-I card.
NTP-A8 Attach Wires to Alarm, Timing, LAN, and Craft Pin Connections, page
this procedure as needed to set up wire-wrap pin connections.
NTP-A120 Install an External Wire-Wrap Panel to the AEP, page
connect an external wire-wrap panel to the alarm expansion panel (AEP).
NTP-A9 Install the Electrical Card Cables on the Backplane, page
if you plan to install electrical card cables.
NTP-A10 Route Electrical Cables, page
continuing with the
"NTP-A11 Install the Rear Cover" procedure on page
"Required Tools and Equipment" section on page
"NTP-A2 Install the Shelf Assembly" procedure on page
1-5—Complete this procedure to install the shelf
1-6—Complete this procedure to access the
1-7—Complete this procedure to access the
1-7—Complete this procedure if you plan to install electrical cards.
"NTP-A9 Install the Electrical Card Cables on the Backplane"
1-9—Complete this procedure before continuing with
1-10—Complete this procedure to install the fan-tray
1-12—Complete this procedure if you are
1-23—Complete this procedure as needed before
C H A P T E R
1-4—Complete this procedure
1-10.
1-15—Complete
1-16—Complete this procedure to
1-22—Complete this procedure
1-23.
Cisco ONS 15454 Procedure Guide, R5.0
1
1-2.
1-5.
1-1