Alumax ProLine PL60 Руководство по установке - Страница 8

Просмотреть онлайн или скачать pdf Руководство по установке для Шкаф Alumax ProLine PL60. Alumax ProLine PL60 9 страниц. Heavy frameless bypass bath enclosure

9
Fixed Panel Installation - Install the "peel-and-stick" Wall Seal [EE]
on the wall side edge of the Fixed Panel. Orient it with the open
end to the inside of the enclosure. Lift the Fixed Panel and set it in
the Glass Clips with the edge as tight to the wall as possible. Loosen
the Set Screws in the wall mount sleeves and slide them over the Wall
Mount Blocks. Snug the Set Screws into the block (DO NOT TIGHTEN).
Loosen, but do not remove, the Glass Mount Screws and make sure the
Header Bar is still level, or has a slight tilt toward the door side. Small
adjustments in the Header Bar can be made with the Set Screws in the
Wall Mount Sleeves. Once you have the Header Bar set as you want
it, and the Fixed Panel positioned correctly, tighten the Wall Mount Set
Screws, then the Glass Mount Screws.
10
Door Panel Installation – Lift the Door Glass [R] and place the
rollers on the bar, making sure to get the bottom edge of the
Door Glass into the Center Guide. To adjust the Rollers, up or down, the
Door Glass will have to be removed and the Rollers taken off. Rotate
the Glass Insert to move the off-center hole to the top or bottom of the
hole in the Door Glass. Rotating the Glass Insert to the bottom position
will raise the Door Glass, rotating it to the top will lower it. Reinstall the
Door Glass and Rollers, if necessary. Install the Rollers that go under the
Header Bar, adjusting them so that they are as close to the bottom of
the bar as possible.
Page 8 of 9