Alumax ProLine PL60 Руководство по установке - Страница 9
Просмотреть онлайн или скачать pdf Руководство по установке для Шкаф Alumax ProLine PL60. Alumax ProLine PL60 9 страниц. Heavy frameless bypass bath enclosure
11
Seal Installation – Cut the Bulb Vinyl [FF] to the vertical length of
your Door Glass. Cut the Panel Seal [GG] to the length of the
door glass minus 4". Press the Bulb Vinyl on the strike side of the Door
Glass and the Panel Seal on the other, below the Header Bar. A small
amount of silicone can be used between the glass and seal if you like.
12
Set the Stops – Move the door to the closed position. Slide the
Stopper [BB] over until it touches the top roller on the strike side
of the door. Tighten the Stopper Set Screw [CC] with the bumper in the
up position. Move the door to the open position with the handle 1/4" -
1/2" from hitting the fixed panel. Slide the other stopper over until it just
touches the top roller on the fixed side of the door. Tighten the Stopper
Set Screw with the bumper in the up position.
13
Finishing Up – Make sure that all fasteners are tight. Clean all
exposed marks you made on the sill and walls of the shower stall.
Clean the glass panels.
14
Allow 24 hours for any silicone to completely cure, before using
your new Alumax Shower Door.
Page 9 of 9