Alvarado CSG Руководство по установке и обслуживанию - Страница 5

Просмотреть онлайн или скачать pdf Руководство по установке и обслуживанию для Ограждения и ворота Alvarado CSG. Alvarado CSG 10 страниц. Bi-directional waist high security gate

CSG/SSG/CFG Installation and Maintenance Instructions

Installation Instructions

Anchoring the Hinge Post

1. Once the installation location has been determined,
snap a chalk line on the floor to mark the gate
centerline [Figure 4].
2. Mark the hinge post center and end-of-gate locations
(approximately 41.5") along the centerline. Snap a
chalk line to mark the hinge post centerline
[Figure 4].
3. Center the hinge post where the centerlines meet.
Starting with the flange hole directly under the gate
arm, mark every other hole for a total of (4) anchor
holes [Figure 5]. Set hinge post aside.
NOTE
In some situations, you may not be able to use every
other flange hole (e.g. hitting rebar). In this case use
adjacent flange holes as necessary.
4. Using a hammer drill fitted with a 5/8" concrete drill
bit, drill each anchor hole to a depth of 3".
NOTE
For terrazzo, ceramic tile, or brick veneer
installations, add the thickness of the finished floor
material to the anchor hole depth. Longer anchor
bolts and spacers may be required.
5. Using a shop vac, remove all debris from the anchor
holes before installing the anchors. If the holes
are not clear of debris, the anchors may not seat
properly.
6. Insert anchors into the drilled holes with the threaded
ends down. If needed, use a rubber mallet to tap the
anchor into place. Ensure that the anchors are flush
with the concrete floor [Figure 6].
7. Reposition the hinge post and align the flange holes
with the anchors.
8. Insert a 3/8" anchor bolt and washer though the
flange into each of the anchors.
9. Using a socket wrench and 9/16" socket, tighten
the (4) 3/8" bolts.
10. Use a torque wrench to torque the bolts to 20 ft-lbs.
11. Using a level, verify that the hinge post is straight
and level. If necessary, use washer shims and re-
level.
NOTE
It is important that the hinge post is horizontally and
vertically level with the floor. If not, the gate arm may
not self-close and center properly.
12. Locate the base cover. Using a #2 Phillips head
screwdriver, remove the (2) screws fastening the (2)
halves together.
13. Position the (2) halves of the base cover around the
hinge post flange and secure with the (2) screws
[Figure 7].
Created on: 10/7/2013
©Alvarado Mfg. Co., Inc.
For Assistance: [email protected] (909) 591-8431
Fig. 4
Fig. 4
Marking Centerlines
GATE
CENTERLINE
41.5"*
41.5"
FIGURE 7.1.2
Locating the hinge post centerline.
Fig. 5
Fig. 5
Marking Anchor Holes
Flange
Fig. 6
Fig. 6
Inserting Anchors
Post with Anchor
Hole Alignment
Threaded Side
Down
Flush with
Concrete
Fig. 7
Fig. 7
Base Cover
Page 5
PUD3570R2-0