AERMEC ANK Руководство по установке

Просмотреть онлайн или скачать pdf Руководство по установке для Охладитель AERMEC ANK. AERMEC ANK 14 страниц.

AERMEC ANK Руководство по установке
 
1.1. TOOLS AND PARTS.................................................................2
1.2. SYSTEM REQUIRMENTS..........................................................2
1.3. LOCATION REQUIREMENTS...................................................2
1.4 MINIMUM WATER VOLUME....................................................2
1.5. MINIMUM CLEARANCE.........................................................2
1.6 ELECTRICAL REQUIREMENTS.................................................3
2.1 HYDRONIC CONNECTIONS.................................................4
2.2. ELECTRICAL CONNECTIONS...............................................5
2.2.1CABLE.............................................................................5
2.2.2. CONNECTING POWER SUPPLY........................ .................5
4.1. PREPARATION FOR COMMISSIONING..................................6
4.2. MACHINE COMMISSIONING..................................................7
4.3. SEASON CHANGOVER...................................................................7
GENERAL WARNING FOR THE INSTALLER
The chiller must be installed by a qualified and trained technician. 
AERMEC will not assume any responsibility for damage due to failure to follow these instructions. Before beginning any operation, READ THESE 
INSTRUCTIONS CAREFULLY AND CARRY OUT THE SAFETY CHECKS TO REDUCE ALL RISK OF DANGER TO A MINIMUM. All the staff involved must 
have thorough knowledge of the operations and any dangers that may arise at the moment in which the installation operations are carried out. 
 
 
Vers. 1.1.15 
     
ANK INSTALLATION MANUAL
NORTH AMERICAN REVISION

Table of contents

 
.............................2
...............................4
.......................6
........................6
 
5.1. SET POINT IN COOLING MODE.....................................7
5.2. SET POINT IN HEATING MODE.....................................7
5.3. COMPRESSOR START-UP DELAY.....................................7
5.4. CIRCULATION PUMP...................................................7
5.5.FAN SPEED CONTROL..................................................7
5.6. ANTI-FREEZE ALARM.........................................................7
5.7. WATER FLOW RATE ALARM............................................8
....................................................8
6.1. HYDRAULIC CIRCUIT..........................................................8
6.2. ELECTRICAL CIRCUIT CHECKS......................................8
6.3. COOLING CIRCUIT CHECKS............................................8
6.4. MECHANICAL CHECKS................................................8
6.5.REFRIGERANT LOAD PROCEDURE.................................8
7. LIST OF CONTROLS........................................................9
WIRING DIAGRAM
..........................................................12
............................................................................13
..........................................11