3M Litmann Quality 3100 Talimatlar Kılavuzu - Sayfa 5
Tıbbi Ekipman 3M Litmann Quality 3100 için çevrimiçi göz atın veya pdf Talimatlar Kılavuzu indirin. 3M Litmann Quality 3100 16 sayfaları. Mining cable splice kit
Ayrıca 3M Litmann Quality 3100 için: Hızlı Başlangıç Kılavuzu (2 sayfalar)
3.4
If cable includes a ground check, the ground check connector should be
wrapped with one half-lapped layer of 3M
1700P extending ¼" (6 mm) onto existing insulation, followed by a half-lapped
layer (tacky side DOWN) of Scotch
extending ¼" (6 mm) past the 1700P tape, then using the same ¼" (6 mm)
overlap, add a final layer of half-lapped 1700P tape.
3.5
Connect remaining ground wires.
4.0
Replace Jacket
4.1
Start 1" (25 mm) above split or top of taper and apply half-lapped layers of
130C tape (tacky side DOWN) across splice and 1" (25 mm) past end of
opposite split or top of taper. Apply half-lapped layers, filling all voids until
splice area is returned to greater than or equal to original cable profile.
4.2
Start 2" (50 mm) from 130C tape and apply one half-lapped layer of Scotch
Heavy Duty Mining Tape 31 with mastic side toward the cable across the splice
and continue 2" (50 mm) past the end of the Scotch
Tape 130C. Always wrap the 31 tape toward the machine end of the cable.
Start taping here
2" (50 mm)
past end of
previous layer
78-8127-6830-3-C
1" (25 mm)
past split or
top of taper
Scotch
(Mastic side toward cable)
Temflex
™
Linerless Rubber Splicing Tape 130C
®
Figure 8
Scotch
Linerless
®
Rubber Splicing Tape 130C
Tacky Side DOWN
Figure 9
Machine End
Heavy Duty Mining Tape 31
®
Figure 10
5
Electrical Vinyl Tape
™
1" (25 mm)
past split or
top of taper
Linerless Rubber Splicing
®
®
2" (50 mm)
past end of
previous layer