DANLERS CEPH RE Kurulum Notları - Sayfa 2

Anahtar DANLERS CEPH RE için çevrimiçi göz atın veya pdf Kurulum Notları indirin. DANLERS CEPH RE 2 sayfaları. Ceiling socket mounted photocell switches

Installation procedure
1. Please read these notes carefully before commencing work.
In case of doubt please consult a qualified electrician.
2. Make sure the power is isolated from the circuit.
The Photocell should be plugged into a Klik-AX socket connected
as shown in diagram A:
L
Live in
N
Neutral in
A
Switched Line out
3. DANLERS sell the Klik-AX sockets under the following codes:
CESO:
Circular Klik-AX socket for Besa box
CESO SQ: Square Klik-AX socket for single gang back box
4. Switch on the supply and check the operation.
Lux set-up
The LUX is best set up when it is dark outside and the lights are on.
To do this turn the LUX control fully clockwise to '-' then slowly anti-
clockwise (towards '+') until the red LED turns on.
A: Wiring diagram
L N
Manual wall switch:
Optional for CEPH NO,
for override off.
Compulsory for CEPH RE,
to reset the photocell.
Back box or
BESA box
CESO or
CESO SQ
CEPH NO or
L
N SL
CEPH RE
(A)
B: Adjusting Lux
100
1000
max
min
LUX
Lamp
load