Duratuf KIWI MK2A Montaj Talimatları Kılavuzu - Sayfa 14
Dış Mekan Depolama Duratuf KIWI MK2A için çevrimiçi göz atın veya pdf Montaj Talimatları Kılavuzu indirin. Duratuf KIWI MK2A 16 sayfaları.
Ayrıca Duratuf KIWI MK2A için: Montaj Talimatları Kılavuzu (18 sayfalar)
Step 1: Place shed in final position. Check the di-
agonal measurements are the same and
the shed is level before fitting Floor. It is
recommended that the shed is anchored
down with either a Duratuf Bolt Down Kit or
Duratuf Peg Down Kit depending on what
the shed is sited on.
Step 2:
Lay a Floor Board on top of Bottom Plates and
Joist and push up against end wall. Mark out
where Studs are. Cut checkouts with Electric Jig-
saw so Floor Board will fit around Studs.
Step 3: Re-position Floor Board. Lay out remaining
Floor Boards checking around Studs as
you go. The last Floor Board may have to
be cut to size.
Step 4: Nail in each Floor Board, two 50mm nails in
each end and two into Joists. Measure and
cut Floor Flashing (110) to fit in between
Door Jamb Flashings and nail in place using
50mm Clouts.
MK2A FLOOR
14