Miele DDG 102 Kurulum Talimatları Kılavuzu - Sayfa 17
Havalandırma Davlumbazı Miele DDG 102 için çevrimiçi göz atın veya pdf Kurulum Talimatları Kılavuzu indirin. Miele DDG 102 28 sayfaları. External motor roof installation
Ayrıca Miele DDG 102 için: Kullanım ve Kurulum Kılavuzu (24 sayfalar), Çalıştırma ve Kurulum Talimatları (28 sayfalar), Kurulum Talimatları Kılavuzu (28 sayfalar)
ABLG 202
1) Suction side
The ABLG 202 external motor is
designed for installation inside the
house. Possible locations:
– In the attic or ceiling space
– In an adjoining room, e.g. a pantry or
garage
– In the kitchen, if sufficient insulation
is used
It can be installed horizontally or
vertically.
If installing vertically please observe
the instructions on the next page.
The external motor is connected to the
cooker hood by means of a control
cable and is operated by the controls
on the cooker hood.
Please refer to the operating and
installation instructions for the
cooker hood before installing the
external motor and ducting.
Position the external motor in a
suitable location.
Pay particular attention to the
direction of the ducting
Mark the positions for the four motor
base plate holes on the installation
surface.
Place the motor to one side.
Drill 4 8 mm holes in the positions
marked to a depth of 40 mm for
securing the external motor.
Press S 8 plugs into the drill holes so
that they are flush.
Connect the 3 mountings through the
fixing holes in the motor unit base
plate as illustrated.
Secure the motor with the screws
supplied.
Installation
17