Miele DDG 102 설치 지침 매뉴얼 - 페이지 17

{카테고리_이름} Miele DDG 102에 대한 설치 지침 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Miele DDG 102 28 페이지. External motor roof installation
Miele DDG 102에 대해서도 마찬가지입니다: 운영 및 설치 매뉴얼 (24 페이지), 작동 및 설치 지침 (28 페이지), 설치 지침 매뉴얼 (28 페이지)

Miele DDG 102 설치 지침 매뉴얼

ABLG 202

1) Suction side
The ABLG 202 external motor is
designed for installation inside the
house. Possible locations:
– In the attic or ceiling space
– In an adjoining room, e.g. a pantry or
garage
– In the kitchen, if sufficient insulation
is used
It can be installed horizontally or
vertically.
If installing vertically please observe
the instructions on the next page.
The external motor is connected to the
cooker hood by means of a control
cable and is operated by the controls
on the cooker hood.
Please refer to the operating and
installation instructions for the
cooker hood before installing the
external motor and ducting.
 Position the external motor in a
suitable location.
Pay particular attention to the
direction of the ducting
 Mark the positions for the four motor
base plate holes on the installation
surface.
 Place the motor to one side.
 Drill 4  8 mm holes in the positions
marked to a depth of 40 mm for
securing the external motor.
 Press S 8 plugs into the drill holes so
that they are flush.
 Connect the 3 mountings through the
fixing holes in the motor unit base
plate as illustrated.
 Secure the motor with the screws
supplied.
Installation
17