Cisco ASR 920 series Kurulum Kılavuzu - Sayfa 21
Anahtar Cisco ASR 920 series için çevrimiçi göz atın veya pdf Kurulum Kılavuzu indirin. Cisco ASR 920 series 42 sayfaları. Aggregation services router
Ayrıca Cisco ASR 920 series için: Kurulum Kılavuzu (36 sayfalar), Başlarken (6 sayfalar), Donanım Kurulum Kılavuzu (46 sayfalar), Manuel (36 sayfalar)
Installing the Cisco ASR 920 Series Router
Step 2
If the SFP module that you are using has the markings, use them to identify the top side of the module.
Step 3
Align the SFP module in front of the slot opening.
Step 4
Insert the SFP module into the slot until you feel the connector on the module snap into place in the rear of the slot.
Figure 18: Installing an SFP Module into an SFP Module Slot
Do not remove the dust plugs from the fiber-optic SFP module port or the rubber caps from the fiber-optic
Caution
cable until you are ready to connect the cable. The plugs and caps protect the SFP module ports and cables
from contamination and ambient light. Store the dust plugs for later use.
Step 5
Insert the cable connector into the SFP module:
• For fiber-optic SFP modules, insert the LC cable into the SFP module.
• For copper 1000BASE-T SFP modules, insert the RJ-45 cable connector into the SFP module.
Remove SFP Modules
To remove an SFP module from a module receptacle, follow these steps:
Cisco ASR 920 Series Aggregation Services Router Hardware Installation Guide
Remove SFP Modules
21