Cisco ONS 15454 Paketten Çıkarma ve Kurulum - Sayfa 12
Sunucu Cisco ONS 15454 için çevrimiçi göz atın veya pdf Paketten Çıkarma ve Kurulum indirin. Cisco ONS 15454 42 sayfaları. Four-shelf and zero-shelf bay assembly
Ayrıca Cisco ONS 15454 için: Kurulum Talimatları Kılavuzu (22 sayfalar), Kurulum (32 sayfalar), Kurulum (32 sayfalar), Paketten Çıkarma ve Kurulum (40 sayfalar)
Installation Instructions
To route fiber, remove the two top covers on the base plate or extender base by unscrewing the two
Step 2
screws on the covers, as shown in
Figure 8
When the covers have been removed, you have access to the base of the rack and any holes previously
cut into the raised floor tile, as shown in
Figure 9
You can use the base plate or extender base holes to route the fibers. Cisco recommends using the base
plate holes for the bottom node and the extender base holes for the other three nodes on the four-node
rack.
All electrical cables will be routed in the back of the rack in the extender bases. Holes should already be
cut out in the raised floor tile to compensate for any DS1, DS3, ground and power cables.
Unpacking and Installing the Cisco ONS 15454 Four-Shelf and Zero-Shelf Bay Assembly
12
Figure
Base plate with two top covers removed
Raised floor base fiber routing close-up
8.
Figure
9.
78-13271-05