Apollo 7100 Посібник з монтажу - Сторінка 8

Переглянути онлайн або завантажити pdf Посібник з монтажу для Відкривач воріт Apollo 7100. Apollo 7100 16 сторінок. Residential & medium duty commercial slide gate operator

Four 1/2" anchor bolts (not supplied) are
recommended to mount the chassis. The
holes should be drilled with a 1/2"
concrete drill bit.
STEP 1. Set the operator on the pad as shown. Align the sprockets 3 to 5 inches from the inside
surface of the gate.
STEP 2. Mark the four mounting holes on the pad.
STEP 3. Remove the operator and drill the holes according to the anchor bolt manufacturers in-
structions.
STEP 4. Replace the operator and fasten to the pad.
Chain path
(Make sure
the chain
path clears
all posts and
obstacles).

OPERATOR INSTALLATION

TOP VIEW
3"- 5"
7
Mounting
Holes (4)