Adey MagnaClean Professional Інструкція з монтажу та обслуговування - Сторінка 2
Переглянути онлайн або завантажити pdf Інструкція з монтажу та обслуговування для Системи фільтрації води Adey MagnaClean Professional. Adey MagnaClean Professional 7 сторінок.
Installation
MagnaClean
Professional is suitable for all central
®
heating systems and can be fitted anywhere on the
main circuit. However, in order to achieve the best
protection for the boiler, it is recommended that
MagnaClean Professional is fitted after the last
radiator before the boiler. In determining a suitable
location for installation, it is important to ensure you
allow adequate access for servicing.
The following instructions are designed to assist
engineers in the safe and effective installation and
servicing of ADEY's MagnaClean Professional and
should be followed at all times. Any queries arising
from either installation or servicing should be directed
to your supervisor or ADEY direct on 01242 546700.
Open vented system
Combi/Sealed system
In both diagrams, position A is best practice
while B is suitable.
N.B. We firmly recommend MagnaClean Professional is
installed and serviced by a qualified heating engineer.
1
Drain the central heating system or plug-off feed
and expansion tank and release the system
pressure. Measure and mark a 110mm section for a
22mm unit and a 195mm section for a 28mm unit
when making the connections with elbows
supplied, as shown in 3 below. When installing
below a boiler or other object, allow 250mm
clearance from the top of the canister to beneath
the object, to enable the lid assembly to be
removed when servicing. This applies to both 22mm
and 28mm MagnaClean Professional canisters.
2
Using a suitable cutter, carefully remove
the marked section of pipework to create
the correct opening.
3
Prepare the pipe and fittings accordingly.
Lubricate the olives and assemble the valves
on the pipe. Hand tighten.