Kohler K-1018 Installationshandbuch - Seite 14

Blättern Sie online oder laden Sie pdf Installationshandbuch für Armaturen für das Badezimmer Kohler K-1018 herunter. Kohler K-1018 40 Seiten. Shower modules and receptors
Auch für Kohler K-1018: Handbuch für Hausbesitzer (8 seiten)

4. Fasten the Receptor in Place
NOTE: If the unit is shimmed, make sure the length of the fasteners is sufficient to span the shims and penetrate
into the studs at least 1" (2.5cm).
- Tack the corners of the receptor into place using #6 large head galvanized nails (not supplied) to fasten the unit.
- Shim the receptor as needed at each of the remaining wall studs and finish nailing the receptor into place in the
predrilled holes.
NOTE: The finished walls should be installed as plumb as possible. If the finished walls are not plumb, the
shower door installation will be affected.
- Complete the finished walls.
A
1024937-2-
14
Kohler Co.