ESI ESRTP4+ Manual de instrucciones de instalación - Página 4

Navegue en línea o descargue pdf Manual de instrucciones de instalación para Termostato ESI ESRTP4+. ESI ESRTP4+ 11 páginas. Programmable room thermostat
También para ESI ESRTP4+: Instrucciones de uso (11 páginas)

ESI ESRTP4+ Manual de instrucciones de instalación

1. Technical Specification

Programmable Room Thermostat

Programming
Power supply
Temperature sensor type
Temperature adjustment range
Total switch rating
Contact type
OpenTherm
Connections
Maximum line length
Maximum cable resistance
Plastic
Number of programs
Protection rating
Dimensions
Number of events per day
BST/GMT time change
Factory pre-set programme
Complies with:
6
7 Day, 5/2 Day & 24Hr
2 x 1.5V Lithium batteries
(type: AA size)
+/- 0.5°C at 20°C
5°C to 35°C
6(2)A 230VAC
SPDT
(Volt free changeover contacts)
Polarity free
50 meters
2.5 Ohms
Thermoplastic, flame retardant
4 or 6 (Default: 4)
IP30
127mm(L) x 81mm(W) x 28mm(D)
4 - 6
Automatic
Yes
EN60730-1 EN 60730-2.7, EMC
Directive 2014/30/EU, LVD
Directive 2014/35/EU
2. Installation

Installation Safety Instructions

2.1
The unit must be installed by a suitably qualified person in
accordance with the latest IEE Wiring Regulations.
Isolate mains supply before commencing installation. Please
read all instructions before proceeding.
Ensure that the fixed wiring connections to the mains supply is
via a fuse rated at not more than 6 amps and class 'A' switch
having a contact separation of a minimum of 3mm in all poles.
The recommended cable sizes are 1.0mm sqr or 1.5mm sqr. No
earth connection is required as the product is double insulated
but ensure continuity of earth throughout the system.
General Safety Instructions
2.2
When fitting batteries, do not mix old and new batteries
together. Do not use rechargeable batteries.
This product complies with the essential requirements of the
following EC Directives:
• Electro-Magnetic Compatibility Directive 2014/30/EU
• Low Voltage Directive 2014/35/EU
• EC Marking Directive 93/68/EEC

Maintenance

2.3
Always isolate the mains supply before commencing any work,
servicing or maintenance on the system. And please read all
instructions before proceeding.
Arrange for an annual maintenance and inspection schedule to
be carried out by a qualified person on every part of the heating
and hot water system.
7