Automatic Technology Australia Securalift GDO 2v4 Instructions d'installation et manuel du propriétaire - Page 6
Parcourez en ligne ou téléchargez le pdf Instructions d'installation et manuel du propriétaire pour {nom_de_la_catégorie} Automatic Technology Australia Securalift GDO 2v4. Automatic Technology Australia Securalift GDO 2v4 19 pages.
STEP
1
Slide trolley
assembly
onto
index
tube
(one piece only) and insert screwdriver or clevis
pin
to
hold
it
on tube and slide
it
into
support
tube
assembly.
Arrow on trolley
must
point
to'
'rds
Garage
Door. To
assemble
the rest
of
thtstubes, always slide short insert tube .half
way into the long tube, then slide other
tube
into remaining insert tubes. Continue this proc-
ess
with
remaining tube
until
desired
length
is
achieved.
STEP
2
Operator
is
supplied
with
9
teeth
Drive
Sprocket on Drive
Unit
If
the Operator is to
be
fitted
to
a
J Type
Tilt fitting
Door,
exchange
9
teeth Sprocket on Drive
Unit, with a
7 tee}
drive
sprocket available
as an option
from
ATA.
IMPORTANT:
If
using Track Door
(often
rtred
to
as Panel
Lift
Door
or
Track Tilt
Door)
use
only 9
teeth
Drive
Sprocket on
Dive
Unit.
If
using
J
type door
use
only 7
teeth
sprocket on Drive Unit.
STEP
3
Attach
one end
of
chain (supplied)
to
trolley
chain index screw, nearer
to
drive unit,
using
one
joint link.
(Fig. 3)
Proceed
to
lvrap chain
around
Drive
Unit
Sprocket/Idler Wheel and Idler Wheel on pipe
Assembly.
NOTE: Make
certain
that teeth
of
drive
unit
Sprocket
is
engaged
in
the chain and that
the
chain is not twisted. Make
sure
that the chain
is engaged in the plastic chain idle wheel on the
support pipe assembly.
Q6l'"'*
@
-.x
SUPIPORIIIPIPIE.ASSIEMtsILY
SHUTILE.ASSEMBLY
SCIRISW
DR,NV]ER.
\
TUEIE-338
-.-\
\r-\
\o
NNSERT
']IUtsE.2970
FIG.2