Cisco TelePresence IX5200 Manuel d'installation - Page 12
Parcourez en ligne ou téléchargez le pdf Manuel d'installation pour {nom_de_la_catégorie} Cisco TelePresence IX5200. Cisco TelePresence IX5200 36 pages.
Également pour Cisco TelePresence IX5200 : Manuel de démarrage rapide (15 pages), Manuel de l'utilisateur (26 pages), Première installation (40 pages)
Installing the Lower and Upper Display Frames
5
Level the system end-to-end using a laser level. Use the diamond-shaped leveling marks as a guide for the
horizontal level. Note: When leveling the system, use the outside feet of the two outside display frames (Foot
A in the illustration) and both feet of the center display frame (Foot C in the illustration). Loosen the 19mm lock nut
on the leveling feet, and adjust the feet using the 13mm hex profile above each foot.
Systems using the seismic bracket only: Measure and center the frames, then place the seismic brackets under
the frames and mark the drilling holes. See the "Installing the Seismic Bracket" on page C-1 for more information.
Foot A
Page 2-6
© 2015 Cisco Systems, Inc. All rights reserved.
Diamond-shaped
leveling mark
Foot C
Foot B
19mm Lock nut
13mm hex profile
Foot B
Foot C
Foot A