AgSense CROP-LINK Istruzioni per il cablaggio - Pagina 7
Sfoglia online o scarica il pdf Istruzioni per il cablaggio per Strumenti di misura AgSense CROP-LINK. AgSense CROP-LINK 10. 2012 - 14 soil moisture monitoring
Anche per AgSense CROP-LINK: Istruzioni per il cablaggio (8 pagine)
Wiring the Sentek soil moisture probe
Wiring the Sentek probe: Only 1 probe can be connected to this unit at a time.
1. Connect the Blue wire from the Sentek probe to any terminal marked SOIL as shown
above.
2. Connect the Yellow wire from the Sentek probe to any terminal marked GND as shown
above.
3. Connect the Red wire from the Sentek probe to the terminal marked 5V OUT as shown
above.
to the Crop Link Unit
Page 4