Cisco Profile Series 설치 매뉴얼 - 페이지 28

{카테고리_이름} Cisco Profile Series에 대한 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Cisco Profile Series 44 페이지. Jbod on the 12g sas modular raid controller
Cisco Profile Series에 대해서도 마찬가지입니다: 시작하기 매뉴얼 (41 페이지), 사용자 설명서 (44 페이지), 사용자 설명서 (7 페이지), 시작하기 매뉴얼 (35 페이지), 빠른 참조 매뉴얼 (2 페이지), 구성 매뉴얼 (13 페이지), 설치 시트 (2 페이지), 설치 매뉴얼 (2 페이지), 빠른 시작 매뉴얼 (4 페이지), 빠른 시작 매뉴얼 (4 페이지), 설치 매뉴얼 (16 페이지), 시작하기 매뉴얼 (32 페이지), 매뉴얼 (16 페이지), 시작하기 매뉴얼 (42 페이지), 시작하기 매뉴얼 (46 페이지)

Cisco Profile Series 설치 매뉴얼
Figure 2-7
Mount the router into the rack using the screws provided in the rack.
Step 2
Installing the Router Ground Connection
The router must be connected to a reliable earth ground. Install the ground wire in accordance with local
electrical safety standards.
This equipment needs to be grounded. Use a green and yellow 12 to 14 AWG ground wire to connect
Warning
the host to earth ground during normal use. Statement 242
To install the ground connection, follow these steps:
Step 1
Strip one end of the ground wire to the length required for the terminal.
Crimp the ground wire to the ring terminal using the wire crimper.
Step 2
If you choose to install the power switch lock, perform
Step 3
Step 6
Step 4
Attach the ring terminal to the chassis. Use the single screw provided. Tighten the screws to a torque of
8 to 10 inch-pound (0.9 to 1.1 newton meter) as shown in
Install the power switch lock. Tighten the screws to a torque of 8 to 10 in-lb (0.9 to 1.1 N-m). Torque the
Step 5
hex standoff to the same torque.
Connect the other end of the ground wire to a known reliable earth ground point at your site.
Step 6
Cisco 800M Series Integrated Services Router Hardware Installation Guide
2-8
Attaching the Brackets (I/O side facing the user - Offset rack mount)
1
For NEC-compliant grounding, use size 14 AWG (2 mm2) or larger copper wire and a ring terminal
with an inner diameter of 1/4 in. (5 to 7 mm).
For EN/IEC 60950-compliant grounding, use size 18 AWG (1 mm2) or larger copper wire.
and
Step
7.
Offset rack mount
Chapter 2
1
Step 5
to
Step
7. Otherwise, perform
Figure
2-8.
Installing the Router
Step
4,