Cisco Profile Series Installation Manual - Page 28

Browse online or download pdf Installation Manual for Conference System Cisco Profile Series. Cisco Profile Series 44 pages. Jbod on the 12g sas modular raid controller
Also for Cisco Profile Series: Getting Started Manual (41 pages), User Manual (44 pages), User Manual (7 pages), Getting Started Manual (35 pages), Quick Reference Manual (2 pages), Configuration Manual (13 pages), Installation Sheet (2 pages), Installation Manual (2 pages), Quick Start Manual (4 pages), Quick Start Manual (4 pages), Installing Manual (16 pages), Getting Started Manual (32 pages), Manual (16 pages), Getting Started Manual (42 pages), Getting Started Manual (46 pages)

Cisco Profile Series Installation Manual
Figure 2-7
Mount the router into the rack using the screws provided in the rack.
Step 2
Installing the Router Ground Connection
The router must be connected to a reliable earth ground. Install the ground wire in accordance with local
electrical safety standards.
This equipment needs to be grounded. Use a green and yellow 12 to 14 AWG ground wire to connect
Warning
the host to earth ground during normal use. Statement 242
To install the ground connection, follow these steps:
Step 1
Strip one end of the ground wire to the length required for the terminal.
Crimp the ground wire to the ring terminal using the wire crimper.
Step 2
If you choose to install the power switch lock, perform
Step 3
Step 6
Step 4
Attach the ring terminal to the chassis. Use the single screw provided. Tighten the screws to a torque of
8 to 10 inch-pound (0.9 to 1.1 newton meter) as shown in
Install the power switch lock. Tighten the screws to a torque of 8 to 10 in-lb (0.9 to 1.1 N-m). Torque the
Step 5
hex standoff to the same torque.
Connect the other end of the ground wire to a known reliable earth ground point at your site.
Step 6
Cisco 800M Series Integrated Services Router Hardware Installation Guide
2-8
Attaching the Brackets (I/O side facing the user - Offset rack mount)
1
For NEC-compliant grounding, use size 14 AWG (2 mm2) or larger copper wire and a ring terminal
with an inner diameter of 1/4 in. (5 to 7 mm).
For EN/IEC 60950-compliant grounding, use size 18 AWG (1 mm2) or larger copper wire.
and
Step
7.
Offset rack mount
Chapter 2
1
Step 5
to
Step
7. Otherwise, perform
Figure
2-8.
Installing the Router
Step
4,