AFL IDEAA 144F Instrukcja instalacji - Strona 7
Przeglądaj online lub pobierz pdf Instrukcja instalacji dla Obudowa AFL IDEAA 144F. AFL IDEAA 144F 14 stron.
3. Remove the top plate.
4. Determine the appropriate compression fitting
for the application.
5. Knock out the appropriate mounting hole
to accommodate the compression fitting.
6. Install the appropriate compression fitting.
Reference the Compression Fitting Installation
section of this document.
7. Using local engineering practices, determine the
port to be used on the MPO field for the MPO
distribution cable.
8. Use local accepted practices to clean the connector
end face and plug the connector into the appropriate
port. (Figure 11)
9. Use the fiber management rings to route the
MPO distribution cable through the back side of the
144F IDC. (Figure 12)
Note: A FUSEConnect
may be spliced onto a non-connectorized
distribution cable. The FUSEConnect
Splice-On Connector application will utilize the
same cable installation and routing techniques
outlined in steps 1-7. Reference the installation
instructions provided with the FUSEConnect
MPO Splice-On Connector. The document will
include the following:
•Fiber Preparation
•Fiber Splicing
•Connector Assembly
10. Use local accepted practices to label the MPO
distribution fiber connection in the appropriate space
on the door label, as applicable.
11. Repeat Steps 7 – 10 for each MPO distribution cable
to be installed.
MPO Splice-On Connector
®
MPO
®
®
INSTALLATION INSTRUCTIONS
IDEAA
7
Interior Distribution Cabinet
®
Figure 11
Distribution
Drop
Figure 12
© 2016, AFL, all rights reserved. Revision C, 3.3.17
Specifications are subject to change without notice.