ALUZ A8-ZIZA-TAPE Manual de instruções de instalação - Página 7

Procurar online ou descarregar pdf Manual de instruções de instalação para Equipamento de iluminação ALUZ A8-ZIZA-TAPE. ALUZ A8-ZIZA-TAPE 11 páginas. Led tape
Também para ALUZ A8-ZIZA-TAPE: Manual (14 páginas)

ZIZA
Tape
A8-ZIZA-TAPE
1
Measure area where luminaire will be installed. Use a laser line to create
a reference line along installation area, ensuring consistent alignment of
mounting clips. Mark location where each mounting clip will be installed
along reference line.
2
Unroll lightstrip from reel using a wire puller stand and cut to size as needed.
Note: Include both sets of solder pads if soldering connectors. Refer to
Soldering Guide for details.
3
Remove adhesive backing from lightstrip and stick in place along chalk
line, ensuring lightstrip is securely mounted and free of twists, tangles,
creases, or bumps.
Note: Refer to Application Guidelines to ensure correct installation.
Lightstrip
Remove adhesive backing
4
Determine number of mounting clips needed. Refer to the Mounting Clips
page for details.
Note: The number of required mounting clips differs for dry and wet location
products. Verify number of mounting clips is appropriate for installation
environment before installing. Do not install luminaires with inadequate
number of mounting clips.
5
Lay mounting clips and pre-drill using proper drill bit for surface and screw size.
Recommendation: 8/32 x 1" screw.
Cut to size
Ensure lightstrip
is securely mounted
ALUZ
1170 North Red Gum Street, Anaheim, CA 92806
Phone: 800 921 2254 or 714 535 7900 | Fax: 714 535 7902 | [email protected] | aluz.lighting
© ALUZ All rights reserved. ALUZ reserves the right to make changes or withdraw specifi cations without prior notice.
Mounting Lightstrip (Dry Location Mounting Clips)
6
Screw mounting clips to surface.
Note: Ensure that no mounting clips are covering any LEDs along lightstrip.
7
If applicable, connect disconnects between luminaires or solder connectors
using the steps from Application Guidelines.
8
Perform a continuity test before connecting luminaire to power source.
Installation Instructions
9 / 1 / 2021 / Rev 0
Page 7 of 11