Cisco 6500 - Catalyst Series 10 Gigabit EN Interface Module Expansion Kurulum Notu - Sayfa 9

Anahtar Cisco 6500 - Catalyst Series 10 Gigabit EN Interface Module Expansion için çevrimiçi göz atın veya pdf Kurulum Notu indirin. Cisco 6500 - Catalyst Series 10 Gigabit EN Interface Module Expansion 46 sayfaları. Distributed forwarding card 4 for ws-x68xx, ws-x69xx, and select ws-x67xx modules
Ayrıca Cisco 6500 - Catalyst Series 10 Gigabit EN Interface Module Expansion için: Kurulum Notu (14 sayfalar), Çözüm Kılavuzu (17 sayfalar), Beyaz Kitap (19 sayfalar), Açıklama (1 sayfalar), Ürün Bülteni (6 sayfalar), Uyarı (4 sayfalar), Veri Sayfası (9 sayfalar), Veri Sayfası (18 sayfalar), Beyaz Kitap (18 sayfalar), Yapılandırma Kılavuzu (8 sayfalar), Kurulum Notu (28 sayfalar), Sorun Giderme Kılavuzu (11 sayfalar), Kurulum Notu (18 sayfalar), Kullanıcı Kılavuzu (17 sayfalar), Kurulum Notu (24 sayfalar), Manuel (19 sayfalar), Kurulum Notu (36 sayfalar)

Cisco 6500 - Catalyst Series 10 Gigabit EN Interface Module Expansion Kurulum Notu
The MEM-XCEF720-1GB memory upgrade is required for the DFC3BXL upgrade only and is included
Note
as part of the DFC3BXL daughter card kit only.
These tools and supplies are required to remove and install the DFC3 daughter card:

Removing a CFC or DFC Daughter Card

If your Ethernet module has either a CFC or a DFC daughter card installed, you must remove the old
CFC or DFC daughter card before installing the new DFC daughter card. The folowing procedures are
provided:
An additional procedure for removing DFC3 daughter cards is provided for daughter cards installed on
Note
early versions of the WS-X6748-GE-TX Ethernet module that are equipped with stiffener brackets.
Removing the CFC Daughter Card
Warning
During this procedure, wear grounding wrist straps to avoid ESD damage to the card. Do not directly
touch the backplane with your hand or any metal tool, or you could shock yourself. Statement 94
To remove a CFC daughter card, follow these steps:
Attach an ESD grounding strap to your wrist and to ground.
Step 1
If you are unsure about the correct way to attach an ESD grounding strap, refer to the
ESD Grounding Strap" section on page 42
Remove the Ethernet module from the Catalyst 6500 series switch.
Step 2
If you are unsure about the correct procedure for removing a module from the switch chassis, refer to
the
instructions.
Step 3
Place the Ethernet module on an antistatic mat with the front of the module facing toward you.
Use a Phillips-head screwdriver to remove the installation hardware, which consists of three securing
Step 4
screws and the two cap nuts. (See
78-15893-08
Antistatic mat or foam pad to support the removed module and an antistatic bag to store the removed
Central Forwarding Card (CFC) or DFC daughter card
Your own ESD-prevention equipment or the disposable grounding wrist strap included in the
upgrade kit
Number 1 Phillips-head screwdriver for the DFC daughter card installation hardware
Removing the CFC Daughter Card, page 9
Removing the DFC3 Daughter Card, page 11
"Removing and Installing Ethernet Modules in the Chassis" section on page 34
Catalyst 6500 Series Distributed Forwarding Card 3 for WS-X67xx Modules Installation Note
for instructions.
Figure
1.)
Removing a CFC or DFC Daughter Card
"Attaching Your
for removal
9