Gamma 6004 소유자 매뉴얼 - 페이지 5
{카테고리_이름} Gamma 6004에 대한 소유자 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Gamma 6004 19 페이지. 6 point mounting
Gamma 6004에 대해서도 마찬가지입니다: 소유자 매뉴얼 (20 페이지), 소유자 매뉴얼 (20 페이지), 소유자 매뉴얼 (20 페이지)
ASSEMBLY INSTRUCTIONS
Bellows Installation
The bellows assembly is supplied in two
pieces and should be assembled as follows.
Place the bellows section with the flange
over the upper support column with the
flange on the top. Place the remaining bel-
lows over the upper support column and
mate it with the flange on the lower bellows.
Tool Tray Installation
Lower the tool tray over the top of the upper
column support and let it rest loosely on the
bellows assembly.
Tension Track Installation
Place the tube of the tension track assembly
over the top of the upper column support.
Align the tension track with the long leg of the
base assembly. Securely tighten the two
socket set screws on the tension track as-
sembly tube, locking it to the upper column
support. Align the notch in the tool tray with
the tension track bar while raising the tool
tray. Secure the tray with the set screws in
the side of the tray casting.
4