Draper FlexShade NEXD Instructions Installation & Operation - Page 3

Browse online or download pdf Instructions Installation & Operation for Indoor Furnishing Draper FlexShade NEXD. Draper FlexShade NEXD 10 pages. Clutch-operated small and large hardware
Also for Draper FlexShade NEXD: Installation & Operation Instructions (6 pages), Instructions Installation & Operation (8 pages), Instructions Manual (8 pages), Instructions Installation & Operation (8 pages), Instructions Manual (12 pages)

Draper FlexShade NEXD Instructions Installation & Operation
Bottom-Up FlexShade
Small and Large Hardware
Please Note: If installing Pocket Headbox or Surface Headbox, please install headbox FIRST

Section 1 - Endcap Covers

Caution: Before mounting shades, verify measurements on label provided with shade, and ensure unit is installed at correct width.
Please Note: Installer is responsible for selecting mounting hardware appropriate for site conditions.
Snap endcap covers into place
Figure 1

Section 2 - Mounting Endcaps

Caution: Before mounting shades, verify measurements on label provided with shade, and ensure unit is installed at correct width.
Please Note: Installer is responsible for selecting mounting hardware appropriate for site conditions.
1. Mark wall, ceiling, or jamb for placement of endcaps.
2. Drill small starter hole
(if necessary)
Figure 2
NEXD,
®
.
(Fig. 1)
in mounting surface.
3. Attach idler and operator endcap covers to endcaps.
4. Mount endcaps using appropriate fasteners for surface.
page 3 of 10
.
(Section 12)
PLEASE NOTE:
If endcap covers are
included in order,
drill through endcap
cover and secure
with endcap.
Endcap requires
a minimum of
two fasteners.
It is not necessary
to utilize all four
corners.