Fitting the Wall Brackets
Draw a vertical line on the wall from the centre of
the cooking appliance up to the ceiling, or as high
as the adjoing wall cabinets using a spirit level
and marker pen. This is to ensure the correct
vertical alignment of the appliance.
-
Draw a horizontal line 965mm above the
hob
-
Place bracket item 7.2.1 on the wall as
shown about 1-2mm from the ceiling or
upper limit aligning-notch in the centre of
the bracket with the vertical line.
Mark the hole centres for the bracket
fixing screws on the wall.
-
Place bracket item 7.2.1 on the wall as
shown at 215mm below the first bracket
at X.
-
Mark the hole centres for the bracket
fixing screws on the wall.
INSTALLING THE COOKER HOOD
7.2.1
116
116
-
Mark a hole centre on the horizontal line
965mm above the worktop, 116mm either
side of the vertical line as indicated.
-
Drill the holes marked on the wall using a
Ø8mm drill-bit.
-
Fix the two brackets item 7.2.1.