Centrica Panoramic Power PAN-10 Installation Manual - Page 5

Browse online or download pdf Installation Manual for Accessories Centrica Panoramic Power PAN-10. Centrica Panoramic Power PAN-10 11 pages.

PAN-10 and PAN-12 Sensor installation guide

Overview

The Panoramic Power System monitors electrical energy consumption at
individual circuit level and detects excess usage allowing organizations to
identify and reduce energy and maintenance expenses.
The Panoramic Power System consists of wireless, self-powered sensors
engineered to allow for rapid, non-invasive installation, with almost no
disturbance to operations. Sensors are easily attached to circuit breakers by
just snapping them on to the outgoing electrical wire. They monitor the flow
of electricity through the resulting magnetic field and also use the field as a
power source. The sensors do not require any maintenance.
Data collected by the sensors is sent to a bridge, which, in turn, transfers the
information to the Panoramic Power System server through the Internet,
using Cloud technology.
The sensors report the energy consumption to the bridge at sub-minute
intervals. Consumption reports can be retrieved through the system.
This user guide explains how to install the sensors.

Workflow

Sensor installation consists of the following steps:
1. Map the circuits. See 'Panoramic Power deployment tool
user guide'.
2. Physically attach the sensors to the wires (this guide).
3. Monitors the proper functioning of the sensors. See
'Panoramic Power deployment tool user guide'.

Unpacking the hardware

63A (PAN-10) sensors are shipped in 12-unit packs and 225A (PAN-12) sensors
are shipped in 9-unit packs.
The package includes the following items:
9 or 12 sensors.
1 sensor opener for 63A sensors
Revision 1.4 January 2018
© 2018 Centrica plc. Registered office: Millstream, Maidenhead Road, Windsor, Berkshire. SL4 5GD.
Registered in England & Wales No 3033654
5